Shelving Project

In theory I can plan a home improvement project, do the math, make a list, and take a single trip to the store for supplies. So far my two-day-old shelving project has required one trip for boards and brackets, a second trip for screws and sandpaper, then a third trip to return sandpaper and buy sandpaper sheets large enough to fit the hand sander. A fourth trip will be necessary for additional boards and brackets, but at least now I can start work. Well, I can when it cools down outside. I don’t really want to deal with wood dust inside the house. Thus my morning project turns into an all day project. I console myself with the thought that once I am done my books will no longer have to live in boxes.

The second day of the project fares better than the first. I get up early to sand the edges of the boards and apply the first layer of stain. I only do two boards. They are proof of concept before I begin sanding a dozen more boards. They look nice sitting out on my deck rail drying. Hopefully they will continue to look nice when transported to my office. I’m really glad to finally have something visible for all the running around I did yesterday. Some days all my work vanishes so that I end the day wondering where the time went. Most of my summer work falls into this category. “Creating structure and schedule” is a crucial task around here, but success is invisible while failure is obvious. At least with the shelves there is something tangible.

1 thought on “Shelving Project”

  1. Just a thought. One of the tricks of project management is to always put a visible product on a sequence of actions. That can be a meeting, poster, report, or whatever, but making something visible out of the invisible process is important. You might want to add some visible results to your invisible success stories?

Comments are closed.